All Levels
2
Level 2

Prompted Operator

Move from ad-hoc searches to repeatable, template-driven prompts. Learn which AI tools are approved for which data sensitivity, practice the depersonalize workflow to keep CUI out of unclassified commercial tools, and work through structured prompts against real depot data scenarios.

Depot example: Use GenAI.mil to draft a carrier maintenance BLUF, depersonalize a maintenance record before sending to a commercial AI, or run the morning huddle prompt arc against a CSV of work orders.

Which tool for which data?

Public / Non-CUI

Schedules, invites, general research, non-sensitive drafts.

✓ Any tool — ChatGPT, Claude, Gemini

CUI / PII-containing

Maintenance records, personnel data, BuNos, EDIPI.

✓ GenAI.mil (IL5) only — or depersonalize first

Classified

Operational plans, SIPR content, COMSEC.

✗ No current IL5 AI tool. SCIF only.

Training Scenarios

Level 2

Depersonalize — Navy FRC Maintenance Record

Strip PII/CUI from a notional Navy Fleet Readiness Center record so it is safe to paste into a commercial AI tool. Demonstrates Step 1 of the IL-compliance workflow.

View walkthrough
Level 2

Re-personalize — Restore Tokens into AI Draft

Substitute placeholder tokens back into an AI-generated draft to produce the final IL5-ready memo. Completes the depersonalize → commercial AI → re-personalize loop.

View walkthrough
Level 2

Public Task — Command Picnic Planner

Non-sensitive, non-CUI task: plan a unit picnic. Any public tool is fine — no depersonalization needed. Shows when and why the IL compliance workflow is NOT required.

View walkthrough
Level 2

Navy — Carrier Availability Backlog BLUF

Notional carrier maintenance availability table → BLUF memo for the Admiral's brief. Demonstrates summarizing complex depot backlog data in under 2 minutes.

View walkthrough
Level 2

Air Force — AOG Parts Triage Memo

Notional Air Logistics Complex AOG status list → prioritized triage memo for the Wing Commander. Demonstrates AI-assisted maintenance decision support.

View walkthrough
Level 2

Army — Depot Work-Order Prioritization

Notional Army depot work-order queue with a 21-hr shortfall → prioritized schedule and commander summary. Demonstrates AI triage and production planning support.

View walkthrough
Level 2

BLUF Rewrite — AI Policy Memo (DoD Notional)

Dense notional DoD policy memo on AI tool usage at depots → BLUF summary, key-dates table, and ambiguity flags. Shows how to make policy actionable with AI.

View walkthrough
Level 2

Depot Morning Huddle — AI-Assisted Production Brief

Download the three notional depot spreadsheets, choose the right AI tool for your data sensitivity, upload, and run a six-step prompt arc that turns raw WIP, supply, and throughput data into a 0700 stand-up brief.

View walkthrough

Training Tools

Training Data Files